Pricing
Real numbers, before you commit to anything.
No sales call required to find out roughly what your garden will cost. Three bands, clear starting figures and a tool that gives you your own range in two minutes.
How it works
Two figures, one studio
Find your band
What kind of garden are we talking about?
Roughly the size of your plot decides which band you're in. Use it to get a feel for where you sit, then run the Estimator for a figure tailored to your actual garden.
Lifestyle & Family Garden
From city courtyards to the classic UK back garden, built around how you actually live outside.
Country & Mini-Estate
More ground to work with. Multiple destinations, real distance between them.
Estate & Parkland
Substantial grounds with room for a masterplan, not just a garden.
Figures shown are Standard spec with no additional site or wish-list complexity, the lowest point each band can start from. Sloped or restricted sites, a bigger wish list and Premium or Ultra Premium finishes all move the number up.
Every project gets a proper Estimator run and a Fit Call before anything is confirmed. Nothing here is a quote, it's a starting point.
During the build
Stewardship while your garden takes shape
Once construction starts, someone needs to be keeping the build on-spec and on track. Stewardship puts us on your side through it, whether that's us checking the site in person or reviewing progress from a distance.
Remote Build Stewardship
For projects where a capable local contractor or project manager already has the site covered.
- Progress reviewed remotely each month
- One client update call each month
- Email support within agreed hours
- Site visits available on request, billed separately
Build Stewardship
For clients who want us physically checking the build, not just reading updates about it.
- Everything in Remote Build Stewardship
- One site visit each month
- A written progress report after every visit
- Extra visits or major redesign work scoped and billed separately
When billing starts
Stewardship billing begins at construction start, not at design handover.
Minimum commitment
Three months. Mobilisation takes up the first, handover takes up the last. Anything shorter doesn't give us room to do the job properly.
Pausing
Only when the build is genuinely inactive, and only with advance notice.
Next step
Want your actual number?
The Estimator takes your real size, finish level and site details and gives you a build cost and design fee range in about two minutes.